How long (approximate hours) would it take a contractor to install crown moulding and a chair rail?

The room for crown moulding is around 15' by 12'
The room for the chair rail is 10' by 12'

Answers:
3

Other answers:
What takes the longest is setting up, measuring and cutting the angles on th crown. Approx. 3-4 hours give or take a break.
What takes the longest is setting up, measuring and cutting the angles on th crown. Approx. 3-4 hours give or take a break.
every one has their own speed ,average time , with material ready on job ,square rooms ,straight walls with studs available two and one half hours for a 12 by 15 room for crown and two hrs for a 10 by 12 room, chair rail & every job is different.depending on working conditions Does not include spakling or chaulking.
  • Curtains or Blinds, which do you prefer?
  • how is serta mattress?
  • I am looking for insect or bug bed covers for a 9 yr old boy who loves bugs?
  • What are some suggestions for carpet color in living room?
  • Do you have your kids toy box in their bedroom and why/why not?
  • what are those things called that are like framed opaque oriental screens?
  • Painting over rust???? Need a quick Fix?
  • how much do you think i'll pay to get my kitchen coutertops remodeled?
  • Where can I find Ball Chairs? (I enjoy Pictures)?