What is the correct mositure content for a screeded floor ?

I layed a floor with rmc fibre screed 10 months ago and tested it with a protometer. I got a moisture reading of about 19% is this ok? The floor has been washed over with a pva solution to supress the dust could this have retained some of the moisture?

Answers:
Concrete will always take on moisture. That's the reason vapor barriers are used over them when installing finish flooring over them. 20% moisture is normal and fine. Do what you need to do next.

Other answers:
consistencey of mustard powder yes you should have waited until the screed had dried usually about 3 or 4 days
consistencey of mustard powder yes you should have waited until the screed had dried usually about 3 or 4 days
it shouldn't be more than 5%
u know that PVA solution maintains very low viscosity right?
  • Is there a scematic for Hansa #338 faucets? The replacement hose I rec'd doen't go thru the top end.?
  • how to make an adirondac style railing? Where can I get instructions?
  • Can I use CAT 5e gray or blue for telephone wiring from the outside jack under the house and into a back room?
  • Has anybody worked on Bio gas prepared from kitchen waste, in India?
  • How do you step down baseboard to transition to different floor heights?
  • This ones for you welders out there?
  • How can you build an in-ground pool - as a Do-It-Yourself that is?
  • Installing a prehung door - what's the optimum clearance for the undercut to a wood floor, 1/8 or 1/4 inch?
  • Wiring problems beside thermostat, please abet?