If you are an electrician contained by Springfield mo?
Answers: There are a couple of things that come to mind... This is not a easy entry to do without prior erudition about power and not to waste yourself while doing this. If you have an transmitter feed into your house... you can remove adjectives of the load from your meter. This is shutting bad all of the breakers and/or removing adjectives of the fuses. Then check the power with an amp meter making sure adjectives power has be shut down. This is the point that you are taking a risk of doing yourself in. Cutting the power wires from the pole in need dropping the wires to the ground or shorting the wires and having a bigger problem. This is not for the woozy at heart. You need to own the replacement panel and meter section available for replacement. Lets move about back to the adjectives of the wires... you need to identify the power wires and the nonpartisan wire. Assuming this is 240volts/with the colourless. Let me also advise that this is assuming the responsibilities for loading the transformer from the utility company... contained by other words you have assumed the responsibilities for anything that go wrong. So, if this is the case and you want to verbs... after you have removed the wires from your transmitter feed and not electrified the house and/or anything. You can remove the existing panel and meter unit. Replace it with the up to date panel... hopefully, you have increase the panel size and calulated the nouns that you will need for the adjectives. After you place all the wires stern into the new panel consequently you need to clear sure you haven't shorted anything out and make sure that you own installed the grounds for the panel and bonded it to the other utilities (gas, water). After all this is completed, later placing the wires back on to the unknown entrance cable is due. This is illegal lacking the permits and inspection. I would seize a licensed contractor to work with you if nought else. It is not hard but within is a lot that you are taking responsibilities for short 100% knowledge of what you are doing.
Sorry.
Unless you hold a separate main disconnect
switch, it can't be done soundly without a utility
shut down, and that involves an inspector.
If you do enjoy a disconnect:
* hang the current panel,
* carry the telecommunication, (same size as existing or larger),
up to the switch,
* turn the switch off.
* double hit the new cable to the load side of the switch.
Now both panel are hot and you can switch in your
clean wiring circuit by circuit.
DO obtain a new panel equipped beside a Main C.B. so
you can keep the bus cold while you work within it.